Line Balancing & Yamazumi Workbook – cover image
LeanMicrosoft Excel Desktop (Windows)Version 1.0.1English

Line Balancing & Yamazumi Workbook

Calculate takt from demand, list the work elements, compare the current station split with a rebalanced proposal and see the effect on operators, output and balance loss. A line balancing tool for one manual or semi-automatic line.

€14.90

Purchase link coming soon

Not tested on Mac, Excel for the web or Google Sheets.

What it does

A line balancing tool for one manual or semi-automatic line. Enter demand and available time once; the workbook calculates takt and planned cycle time. List the work elements with their time, value type and precedence, assign them to stations for the current state and for a proposal, and the BALANCE sheet shows the Yamazumi charts against takt, the bottleneck, output, capacity, balance efficiency and the minimum number of stations.

Key features

  • Sheets: START, SETUP, WORK ELEMENTS, BALANCE

What's included

1 Excel workbook (KW-LEA-001-EN-GEN-KIT_Line-Balancing-Yamazumi-Workbook_v1.0.1.xlsx, English) and 3 text files (LICENSE_EN.txt, CHANGELOG_EN.txt, SUPPORT_EN.txt) in one folder.

  • KW-LEA-001-EN-GEN-KIT_Line-Balancing-Yamazumi-Workbook_v1.0.1.xlsx
  • LICENSE_EN.txt
  • CHANGELOG_EN.txt
  • SUPPORT_EN.txt

How it works

  1. SETUP: enter customer demand per day, shifts, available time per shift and the planning factor; name your stations.
  2. WORK ELEMENTS: list every element in process order with time (s), value type and the element it must follow (if any); assign the current station.
  3. Enter the proposal: proposed station and, where you remove waste, a proposed time. Watch the check column for precedence errors.
  4. BALANCE: compare current and proposed Yamazumi charts and metrics; iterate until every station is at or below the planned cycle time.

First use and example data

  • The workbook contains a fictitious pump assembly line (28 work elements, 6 stations today, 4 in the proposal). To start your own study, select the yellow cells in SETUP and WORK ELEMENTS and press Delete.

Screenshots from the workbook

Technical information and compatibility

Target environment: Microsoft Excel Desktop on Windows. No macros, no internet connection. Sheets are protected without a password (Review > Unprotect Sheet). Capacity: 100 work elements, 12 stations.

Not tested on Mac, Excel for the web or Google Sheets.

Notes on use and calculation

  • Takt = available production time per day ÷ customer demand per day. Planned cycle time = takt × planning factor (the factor leaves room for losses; set 100 % to balance to takt).
  • One operator per station. Line cycle time is the longest station time (bottleneck). Balance efficiency = total work content ÷ (stations × bottleneck time).
  • Element times should be observed or standard times per unit. Walking, searching and waiting belong in the list as waste so that the chart shows them.

File format and delivery

Digital download (ZIP). No physical item is shipped.

Licence

One site, internal use; unlimited users at that site; no redistribution or resale.

Support

For support, please use the messaging function of the shop where you purchased this product.

Related products

  • Microsoft Excel Desktop (Windows)English

    SMED Changeover Analysis Workbook

    Record a changeover step by step, separate internal and external work, quantify the reduction potential and prove the result. A practical SMED study for one changeover.

    €19.90View details
  • Microsoft Excel Desktop (Windows)English

    CI Project Portfolio & Savings Tracker

    One register for all improvement projects of a site: pipeline by stage, planned versus realised savings by month, finance validation and overdue projects in one portfolio view. A portfolio tracker for the continuous improvement projects of one site and one fiscal year.

    €14.90View details
  • Microsoft Excel Desktop (Windows)English

    Guided 8D Problem Solving Workbook

    Root Cause, Corrective Action & Effectiveness System for Manufacturing. It guides you through a structured 8D problem-solving case: from a factual problem definition and containment, through data, possible causes and evidence, to a verified root cause, corrective actions, an effectiveness check and a printable 8D report.

    €14.90View details